Catch up on stories from the past week (and beyond) at the Slashdot story archive

 



Forgot your password?
typodupeerror
×
Technology News

Fixing a 7,000-Ton Drill 101

An anonymous reader writes: At the end of last year, we discussed Bertha, the world's largest tunnel boring machine. During an effort to drill a viaduct beneath downtown Seattle, the machine — clocking in at 7,000 tons, 57.5 feet in diameter, and 326 feet long — got hamstrung by an 8-inch-diameter steel pipe. The complexity and scope of the repair plan rivals that of the project itself. "The rescue operation (workers call it "the intervention") began in late spring with construction on the shaft to reach Bertha. Workers have been sinking pilings in a ring to prevent the shaft from collapsing, using 24,000 cubic yards of concrete — enough for a medium-size office building. Once that ring is complete, digging on the shaft will start. When the shaft is ready, Bertha, which is damaged but still operational, will be turned back on so she can chew through the concrete pilings to reach the center of the shaft. There, the machine will rest on a cradle where workers can detach the front end and hoist it out." That detachable front end? It weighs about 2,000 tons by itself. The repair bill is estimated at about $125 million.
This discussion has been archived. No new comments can be posted.

Fixing a 7,000-Ton Drill

Comments Filter:

Software production is assumed to be a line function, but it is run like a staff function. -- Paul Licker

Working...